Gw-instek APS-1102 User Manual Manuel d'utilisateur Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 265
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
2.4 Simple Operation Checks
APS-1102 Programmable AC/DC Power Source 2-8
2.4 Simple Operation Checks
The following describes simple methods for checking newly purchased products or products that have
been in long-term storage.
This product contains high-voltage parts. Never remove the cover.
All internal inspections of this product are to be performed only by service technicians qualified by
Good Will.
Check that the power goes on normally, and that the measured value set via the control panel is displayed
correctly on the MEASURE screen.
Operation steps
1. Set the APS-1102 power source switch to on.
See3.4.1 Power on/off.
Operation starts once the power is on.
The main operations screen that appears immediately after the power-on shows the same
settings that were displayed the last time the power was turned off. When a newly purchased
unit is turned on for the first time, the initial settings (factory settings) are displayed.
See “3.2 Display and Initial Settings at Power”, for description of the initial
settings.
<1> P ress switch to up ( | ) position. <2> The LCD goes on and displays the initial screen.
WARNING
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 264 265

Commentaires sur ces manuels

Pas de commentaire